Installation is performed using the 3M adhesive strips supplied.
Carefully clean the smooth surface (tile, glass or painted wall), position the holder by exerting firm pressure for 30 seconds, then leave to rest for 12 hours without load before first use.
3-step installation - Total time: 15 min + 12 h drying time
STEP 1 - Surface preparation (10 min)
Thoroughly clean and dry your wall (free of limescale and dust).
- Cleaning degreaser: 70° alcohol or household degreaser
- Limescale removal: white vinegar if necessary
- Dry completely: wait 5 min minimum
STEP 2 - Installation (2 min)
Remove the protective film, then apply the wall mount using firm pressure.
- Definitive positioning (no second chances)
- Firm pressure for 30 seconds over the entire surface
STEP 3 - Curing (12h)
Allow to set for 12 hours before use, to ensure lasting adhesion.
- Do not stress adhesive
- Resistance test after 12h only