ÉCLATANT is attached using the high-performance adhesive strips supplied.
Carefully clean the smooth surface (tiles, glass, laminate), remove the protective film and press firmly for 30 seconds.
To ensure optimum adhesion, wait 12 hours before placing your accessories.
3-step installation - Total time: 15 min + 12 h drying time
STEP 1 - Surface preparation (10 min)
Thoroughly clean and dry your wall (free of limescale and dust).
- Cleaning degreaser: 70° alcohol or household degreaser
- Limescale removal: white vinegar if necessary
- Dry completely: wait 5 min minimum
STEP 2 - Installation (2 min)
Remove the protective film, then apply the wall mount using firm pressure.
- Definitive positioning (no second chances)
- Firm pressure for 30 seconds over the entire surface
STEP 3 - Curing (12h)
Allow to set for 12 hours before use, to ensure lasting adhesion.
- Do not stress adhesive
- Resistance test after 12 hours only