Installation takes just a few minutes, thanks to the 3M adhesive tape supplied.
3-step installation - Total time: 15 min + 12h drying time
STEP 1 - Surface preparation (10 min)
Thoroughly clean and dry your wall (free of limescale and dust).
- Cleaning degreaser: 70° alcohol or household degreaser
- Limescale removal: white vinegar if necessary
- Dry completely: wait 5 min minimum
STEP 2 - Installation (2 min)
Remove the protective film, then apply the sponge holder using firm pressure.
- Definitive positioning (no second chances)
- Firm pressure for 30 seconds over the entire surface
STEP 3 - Curing (12h)
Allow to set for 12 hours before use, to ensure lasting adhesion.
- Do not stress adhesive
- Resistance test after 12h only